Road repairs covering 204 sections with a total length of over 130 km have been completed in Kazan. The work was carried out at major city highways, residential streets, and intra-block passages. Asphalt surfaces were renewed, while sidewalks and bike lanes were installed. The project also provided for a new lighting and extra traffic safety elements. Deputy Head of the Executive Committee Igor Kulyazhev reported on the results at a staff meeting.
“Thanks to the national project ‘Safe and High-Quality Roads,’ the support of the republic, and personally the Rais of Tatarstan Rustam Minnikhanov, we are maintaining a high pace of road repairs — this year we have resurfaced 130 km of roads. Systematic annual work has allowed us to increase the share of roads meeting standards to 85%. This is, of course, a result of such support across all programs. A total of 27 billion rubles has been allocated for these purposes — a huge figure. As noted in the report, the funds are being used to repair courtyards and roads, upgrade storm drainage systems, and install outdoor lighting,” emphasized Kazan Mayor Ilsur Metshin.
Under the “Infrastructure for Life” national project, 14 road sections with a total length of about 8 km have been repaired. In particular, on Nathana Rakhlina Street, the pavement was renewed, sidewalks were repaired and bus stops were upgraded. Necessary traffic safety elements were also installed, which made it possible to launch a new bus route.
On Marshrutnaya and Mozhaiskogo streets, sidewalks and bus stops with new shelters were installed to improve transport accessibility. On Mavlyutova Street, the pavement was repaired, concrete barriers were added, and existing sidewalks were upgraded while new ones were built. The project also included a 1-km bicycle lane and new street lighting.
As a result of the systematic work under the national project “Infrastructure for Life”, the share of roads in good condition in Kazan has reached over 85%.
Seven road sections totaling over 6 km were repaired during the preparations for the Russia–ASEAN summit. Another 41 sections (about 30 km) were upgraded under the program for roads with deteriorated asphalt. Additionally, 19 sections (over 4 km) were renovated as part of the general road network repair. In the villages, 85 sections across 30 residential areas were improved. To reduce accidents, work was carried out at 66 high-risk locations. Under the “Our Yard” program, 418 apartment building grounds were improved, with 600,000 sq. m of asphalt pavement repaired.